"In 2010 all grade levels tested exceeded 90% in reading. Those grade levels tested in math all tested 94% or higher."

Building and Grounds

This site is dedicated to providing Building and Grounds current initiatives of District 57.

Currently, the district conducts an Indoor Environmental Quality Survey at each of its buildings as part of a rotating 4 year schedule. The most recent executive summary of each school’s survey is available and includes updates/reviews since the completion of the last comprehensive survey.

Other current relevant information such as, but not limited to, administrative guidelines, arrangements with park district, and audits may also be posted from time to time.

Downloadable documents

A summary of the Indoor Environmental Quality Survey conducted at Westbrook School is available for review.

05/7/2013

The energy audit was presented to the Board of Education at the February 2, 2012 meeting.

02/3/2012

This document highlights the district's green cleaning standards.

09/14/2011

A summary of the Indoor Environmental Quality Survey conducted at Lincoln Middle School is available for reiew.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Lions Park School is available for review.

03/22/2011

A summary of the Indoor Environmental Quality Survey conducted at Fairiew School is available for review.

03/22/2011

It is the policy of Mount Prospect School District 57 to implement and practice Integrated Pest Management (IPM) procedures to control pests in school buildings and minimize the exposure of students, faculty, and staff to pesticides.

12/9/2010

The following is a summary of the partnership between District 57 and the Mt. Prospect Park District.

12/6/2010